Abbey House Hotel, Cumbria
As Part of the refurbishment, a brand new mains electricity supply was installed through the grounds of the hotel, complete with a fully automated back-up generator facility. The old supply (including sub-station), was subsequently abandoned.
We provided a new 200kVA 3 phase mains supply supported by a 250 kVA back-up generator unit along with a new control panel with a new 400 AMP fully automated change over switch, including Power Surge Arrestor equipment.