Bartle Meadows, Preston

Works consist of the installation of approximately 5km of water, electric and gas mains on site and approximately 1km of off-site gas, water LV; HV Electric to a newly installed and commissioned S/S in the centre of the site.

Due to the sensitivity of the development ( due to its rural location), Bethell liaised very closely with Morris Homes, the local council and the local residents to ensure the substantial Off-site works ( 1km) were constructed without causing unnecessary disruption and delay.

The site commenced September 2016 and is planned to go on for another 7 years. Bethell will be installing all gas smart meters and water meters to all 355 new dwellings.