Stamford Gate

To supply Taylor Wimpey with an Electric, Water and Gas infrastructure to 102 new dwellings to the former Stamford School, Mossley Road, Ashton- Under- Lyne.

The works consisted of excavating and laying approximately 70m in the existing highway from o/s a new Sub station towards the new site entrance. Bethell Utilities liaised closely with Tameside Council as the Gas connection was in the centre of a busy carriageway and adjacent to a secondary school.

The "on-site" works consisted of excavating and laying approximately 700m Gas, Water and Electric mains, connecting 102 new dwellings as well as on site the street lights.

Bethell Utility Services also organised the LV and HV cable diversion across the site entrance with ENWL.