Active Projects
Our active projects page provides a snapshot of the significant projects across our civil engineering and utility services businesses.
Civils
Lot 6 and Lot 9 Frameworks
Wastewater
North West
20m per annum.
2020-2025
Wastewater Network Maintenance and Capital Works Schemes – These works can include major sewer collapses, network upgrades, diversions and improvements required for major developments. Recent projects under the framework have included the construction of large detention tanks, to improve storage capacity.
View related case studyLocal Authority Framework Contracts
Local Authority Framework Contracts
Highways, Structures, Public Realm & Infrastructure
North West and Yorkshire Region
10m per annum.
Ongoing
Works include responsive and planned maintenance, structural repairs, highway improvement schemes, cycle lane schemes, CYCLOPS (Cycle Optimised Protected Signals) junction schemes, and surfacing replacement programmes, making our highways safer for road users, pedestrians, and cyclists.
View related case studyTC056 Highway Maintenance Support
Highways
Manchester
500k per annum.
2023-2027
Minor highway works across the Manchester region.
Welcome Break – Rotherham (M1 J33)
Civils
Rotherham, South Yorkshire
2023-2024
Section 278 highway and enabling works infrastructure for a brand-new Welcome Break service area and forecourt.
AMP 7 – Bury Aesthetic Screens
Shaft Sinking and Tunnelling
Bury, Greater Manchester
10m
2023-2024
350m of open cut sewers, installation of a large CSO, six shafts of up to 6m in diameter, 12m deep, 200m of 1500mm diameter installed using pipe jacking techniques.
Utilities
Electric Vehicle Charging Hubs
Green Energy
Nationwide
1m
Ongoing
Installing EV (electric vehicle) charging stations nation-wide for one of the UK’s fastest growing ultra-rapid charging hub providers.
View related case studyWharton Green, Cheshire
Multi Utility – Residential
Winsford, Cheshire
557k
2021-2023
To design and install multi-utility connections for a 268-home development, featuring 5 innovative “zero carbon” homes.
Electric Vehicle Charging Hubs
Green Energy
Nationwide
100k per project.
Ongoing
Enabling the installation of ultra-rapid EV (electric vehicle) charging stations for one of the UK’s largest independent forecourt operators.
View related case studyIntegrated Infrastructure
Section 278 Highway Works to New Service Station & Food Outlet Development
Integrated Infrastructure
Nationwide
2.5-5m per annum.
Ongoing
Section 278 Highway Works, including the management of utility diversions.
View related case studyCivil Engineering Framework
Integrated Infrastructure
Manchester & East Midlands Airport
10m per annum.
2017-2025
Projects varying from business-as-usual maintenance works to £3m capital works packages being delivered as part of the Airports £1bn Transformation programme.
View related case study