Our active projects page provides a snapshot of the significant projects across our civil engineering and utility services businesses.
Civils

Hulme Hall Capacity Works and Borehole Phase 6
Integrated Infrastructure
Northwich, Cheshire
2020-2025
Underground and above-ground infrastructure to construct new brine fields, including access roads and infrastructure, whilst also fabricating and installing stainless & carbon steel process pipework, HPPE plastic distribution networks, and associated well-heads for the extraction through boring.

Lot 6 and Lot 9 Frameworks
Wastewater
North West
20m per annum.
2020-2025
Wastewater Network Maintenance and Capital Works Schemes – These works can include major sewer collapses, network upgrades, diversions and improvements required for major developments. Recent projects under the framework have included the construction of large detention tanks, to improve storage capacity.
View related case studyLocal Authority Framework Contracts
Local Authority Framework Contracts
Highways, Structures, Public Realm & Infrastructure
North West and Yorkshire Region
10m per annum.
2022
Works include responsive and planned maintenance, structural repairs, highway improvement schemes, cycle lane schemes, CYCLOPS (Cycle Optimised Protected Signals) junction schemes, and surfacing replacement programmes, making our highways safer for road users, pedestrians, and cyclists.

New Effluent Treatment Plant
Wastewater
Elton, Cheshire
2.5m
2022
The construction of a replacement effluent treatment plant, increasing capacity on-site, to enable greater productivity.
Utilities

Helsby Phases 2 & 3, Chester Road
Multi Utility – Residential
Warrington
1.2m
2022-2028
To design and install Water, Gas and HV/LV Electric infrastructure to both phases of a development of 333 plots in total and connections to the new Care Home, including a full street lighting package.

Electric Vehicle Charging Hubs
Green Energy
Nationwide
1m
2022
Installing EV (electric vehicle) charging stations nation-wide for one of the UK’s fastest growing ultra-rapid charging hub providers.
View related case study
Wharton Green, Cheshire
Multi Utility – Residential
Winsford, Cheshire
557k
2021-2023
To design and install multi-utility connections for a 268-home development, featuring 5 innovative “zero carbon” homes.

Electric Vehicle Charging Hubs
Green Energy
Nationwide
100k per project.
2022
Enabling the installation of ultra-rapid EV (electric vehicle) charging stations for one of the UK’s largest independent forecourt operators.
View related case study
Unilever Research & Development Facility
Industrial & Commercial
Birkenhead, Merseyside
850k
2022
New substation for a state-of-the-art research & development facility, with associated cabling and civils works.

Electric Vehicle Charging Hubs
Green Energy
Charnock Richard, Lancashire
300k
2022
Delivering EV (electric vehicle) charging hub infrastructure at one of the North West’s busiest motorway service stations on the M6.

Whittle Surgery
Industrial & Commercial
Whittle-le-woods, Lancashire
100k
2022
Multi-utility connections to a new NHS surgery.
Integrated Infrastructure

Section 278 Highway Works to New Service Station & Food Outlet Development
Integrated Infrastructure
Nationwide
2.5-5m per annum.
2022
Section 278 Highway Works, including the management of utility diversions.
View related case study
Civil Engineering Framework
Integrated Infrastructure
Manchester & East Midlands Airport
10m per annum.
2017-2025
Projects varying from business-as-usual maintenance works to £3m capital works packages being delivered as part of the Airports £1bn Transformation programme.
View related case study