Active Projects

Our active projects page provides a snapshot of the significant projects across our civil engineering and utility services businesses.

Civils

United Utilities  logo

Lot 6 and Lot 9 Frameworks

Wastewater

North West

20m per annum.

2020-2025

Wastewater Network Maintenance and Capital Works Schemes These works can include major sewer collapses, network upgrades, diversions and improvements required for major developments. Recent projects under the framework have included the construction of large detention tanks, to improve storage capacity.

View related case study

Local Authority Framework Contracts

Local Authority Framework Contracts

Highways, Structures, Public Realm & Infrastructure

North West and Yorkshire Region

10m per annum.

Ongoing

Works include responsive and planned maintenance, structural repairs, highway improvement schemes, cycle lane schemes, CYCLOPS (Cycle Optimised Protected Signals) junction schemes, and surfacing replacement programmes, making our highways safer for road users, pedestrians, and cyclists.

View related case study
Manchester City Council logo

TC056 Highway Maintenance Support

Highways

Manchester

500k per annum.

2023-2027

Minor highway works across the Manchester region.

Welcome Break logo

Welcome Break – Rotherham (M1 J33)

Civils

Rotherham, South Yorkshire

2023-2024

Section 278 highway and enabling works infrastructure for a brand-new Welcome Break service area and forecourt.

United Utilities logo

AMP 7 – Bury Aesthetic Screens

Shaft Sinking and Tunnelling

Bury, Greater Manchester

10m

2023-2024

350m of open cut sewers, installation of a large CSO, six shafts of up to 6m in diameter, 12m deep, 200m of 1500mm diameter installed using pipe jacking techniques.

Utilities

Osprey Charging Network logo

Electric Vehicle Charging Hubs

Green Energy

Nationwide

1m

Ongoing

Installing EV (electric vehicle) charging stations nation-wide for one of the UK’s fastest growing ultra-rapid charging hub providers.

View related case study
EQUANS logo

Wharton Green, Cheshire

Multi Utility – Residential

Winsford, Cheshire

557k

2021-2023

To design and install multi-utility connections for a 268-home development, featuring 5 innovative “zero carbon” homes.

Motor Fuel Group logo

Electric Vehicle Charging Hubs

Green Energy

Nationwide

100k per project.

Ongoing

Enabling the installation of ultra-rapid EV (electric vehicle) charging stations for one of the UK’s largest independent forecourt operators.

View related case study

Integrated Infrastructure

Euro Garages logo

Section 278 Highway Works to New Service Station & Food Outlet Development

Integrated Infrastructure

Nationwide

2.5-5m per annum.

Ongoing

Section 278 Highway Works, including the management of utility diversions.

View related case study
Manchester Airport Group logo

Civil Engineering Framework

Integrated Infrastructure

Manchester & East Midlands Airport

10m per annum.

2017-2025

Projects varying from business-as-usual maintenance works to £3m capital works packages being delivered as part of the Airports £1bn Transformation programme.

View related case study