Tootle Green, Longridge

Works consist of the installation of approximately 2km of water, electric and gas mains on site and approximately 600m of HV double circuit HV off site along Dilworth Lane and the installation and commissioning of a Sub-station and associated Housing. The site also had a Gas Governor which was again installed and commissioned by Bethell.

Due to the sensitivity of the development, Bethell liaised very closely with Taylor Wimpey, the local council and the local residents to ensure the Off-site works were constructed without causing unnecessary disruption.

The site commenced May 2016 and is planned to go on for another 4 years. Bethell will be installing all gas smart meters and water meters.